Daily Field Report

Date :07/13/2021
Project No :2020C007
Client Company :Pulte Group
Arrival Time :
Onsite Hours :
Name of the Project :Winslow at Brookstone
Project Location :6156 Collins Road, Acworth, GA 30101
Weather :P
Departure Time :
ASEC Technician Name :Evan Jobe

Observations/Finding

As requested, a ASEC technician was present at the above referenced site for the purpose of conducting a basement wall footing inspection and bearing testing for lot #24

Footing appears to consist of #4 rebar rested on 3″ rod chairs spaced at approximately six 6″ inches on center. Footing preparations appear to be in accordance with Southeast Zone, Date 03/31/2016 Pulte Structural Drawing. The footing evaluation was performed by visual inspection, hand probing and dynamic cone penetrometer (DCP) testing.

During the evaluation, well compacted fill soils were encountered underlain by residual soils. These soils were found to be capable of supporting the building structure utilizing an allowable soil bearing pressure of 2,000 psf. The footings are the proper depth and width and have been prepared in accordance with IRC 2012 and the Georgia Amendments. Lot #24 is ready for concrete placement.

See attached DCP/Boring Sheet for full data.

 The superintendent has been notified of these findings.

Technician Signature / DateEvan Jobe, July 13, 2021
Reviewer Name / DateRamchandra Mogulla, August 15, 2021