Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C168(Reserve @ Gum Springs)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
This report provides a detailed summary of the quality control inspection and testing performed by the ASEC representative. It includes the scope of work, methodology, observations, and test results to ensure compliance with project specifications and codes. Here's a streamlined interpretation: <ol> <li><strong>Scope of Inspection</strong>: <ul> <li>Observed backfill placement and compaction for the water line (locations from Lot #7 through #20) and Redi Rock Retaining Wall #2 and SSFM in the front of Lots # 177, #178, #187 and#189,</li> <li>Verified compliance with project drawings, specifications, and applicable codes.</li> </ul> </li> <li><strong>Key Observations</strong>: <ul> <li><strong>Water Line and Retaining Wall#2 Work</strong>: <ul> <li>Backfill placement and compaction continued, for Retaining wall#2 and water line,</li> <li>Redi Rock Retaining Wall #2 at creek crossing: Proper use of base course material, No. 57 crushed stone, and Geo-Grid placement in wall construction.</li> </ul> </li> <li><strong>Compaction Practices</strong>: <ul> <li>1-foot lifts placed for the water line and compacted using 6-ton pad feet and trench compaction equipment.</li> <li>6- inches lifts placed for the water line and compacted using 9- ton sheep feet and trench compaction equipment.</li> <li><strong>Testing and Results</strong>: <ul> <li>Compaction tested with: <ul> <li><strong>Traxler Nuke Gauge</strong>: Confirming density compliance.</li> <li><strong>ASTM D 2937</strong>: Standard Test for soil density using a drive-cylinder.</li> <li>General probing with a 3/8" probe rod.</li> </ul> </li> <li>Results: The majority of compacted materials met the project requirement of 95% maximum dry density per ASTM 698.</li> </ul> </li> </ul> </li> </ul> </li> <li><strong>Conclusion</strong>: <ul> <li>The report verifies adherence to the specified requirements. The testing data supports the quality of the construction activities observed.</li> </ul> </li> </ol> Should further clarification or discussion be needed, ASEC is available to address questions
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel