Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
<blockquote>Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed: Observed the placement of backfilling for the sewer line between Manholes A12 & A13. The length of the sewer line was approximately 400 feet and was backfilled to finished grade. Compaction tests were performed using a nuclear density gauge. Overall, the results of density testing confirmed that fill compaction met the project and ASTM requirements. Concrete placement for the detention wall footing was performed today. The footing required a total of 57 cubic yards of concrete. One set of seven (7) cylinders were cast. Results attached in a separate report. Please contact us if you have any questions regarding this report. </blockquote>
Upload Images
Image
Description
1
Photo depicting from Manhole A13 towards A12
2
Photo depicting from Manhole A12 towards A13
3
A set of 8x4 cylinders casted
4
Picture showing a 76x8 feet retention wall footing
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel