Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed: Observed the placement of fill/grading for Lots #73 and the sewer line between Manholes A12 and A13 today. Compaction tests were performed using a nuclear density gauge. Overall, the results of density testing confirmed that fill compaction met the project and ASTM requirements. Results are attached in separate reports. The detention pond wall footing which was located on soft soils is now reenforced with 31 helical piers to a depth of 30 feet. In addition, retaining wall rebar was found to meet job specifications for size, spacing and quantity. Please contact us if you have any questions regarding this report or of the density test results.
Upload Images
Image
Description
1
Picture showing lot 73 at subgrade
2
Picture depicting lots at subgrade
3
Picture showing a 9.0' deep sewer line
4
The sewer line after backfilled and packed
5
A 76x8 square feet retention wall footing with rebars perfectly put
6
A closer view of the footing to show the Reenforcing hilicul piers
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel