Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
The down cut and backfill activity was done as usual with several heavy duty machines being employed. These are: 1) Two 745C heavy duty hauling trucks, 2) One 815F CAT packer, 3) One 349E CAT excavator and 4) One 61Pxi Komatsu bulldozer. The required dirt was hauled from the nearby down cut location. And the moisture of the dirt is within the range of plus 3 and minus 3 range, but today in the wet side. The compaction was in the range of 95% and 97%. The backfill location was in Lots 104 and 105 and both lots are now backfilled to a subgrade. Lot#106 which was almost close to subgrade was backfilled with two lifts and is now at subgrade. The test for Lot#119 which did not pass yesterday was packed today, tested and pass.
Upload Images
Image
Description
1
Picture showing Lot#106 at sugrade
2
Picture showing Lot#104 at sugrade
3
Picture showing Lot#105 at sugrade
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel