Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
The routine down cutting and back fill I activity was conducted during the day. This was done using the various heavy duty machines such as: 1) Two 745C hauling trucks, 2) One 815F CAT Roller, 3) One 349E CAT excavator, 4) 61 Pxi Kamatsu bulldozer. The backfill was on Lot# 106, 120 & 119 aligned in about EW direction. The total area was about 250x112 square feet. The three Lots were backfilled to a subgrade. The dirt was hauled from a nearby downcut location and was in a good agreement with the proctor. The compaction was in a range of 96% and 102%, which was pretty good.
Upload Images
Image
Description
1
2
3
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel