Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
Backfill was in two places: 1) Green area behind Lot# 73 and 74 all the way and, 2) Building pads for lots 72, 73 and 74. The dirt was in good moisture which is in agreement with the proctor and the compaction read from the nuclear gauge is in the range of 95 to 99. Proof rolling is perfect and showed 98% and above.
Upload Images
Image
Description
1
Picture depicting Lots 73 and 74 which are a about 3.0 feet below subgrade.
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel