Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
In this day the following routine grading activities were done 1) After down cut of several feets, Lots number 96, 97, and 98 were completed to subgrade (pls take a look at the pictures attached), 2) Lots number 102 after 7 or more feet fill comes to subgrade, 3) Lot numbers 74, 73 and 72 were back filled for more than a foot and 4) Green area between lots 74 and 75 and way down southward was also back filled for about two feet.
Upload Images
Image
Description
1
Picture portraying lot#102 at subgrade
2
A picture of Lot#98 after down cut and subgraded
3
A portrates of lot#97 now at subgrade
4
Picture depicting Lot #96 now at subgrade
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel