Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
The routine hauling in, spreading and packing activity was conducted through out the day. The moisture of the dirt was good enough for compaction and all tests showed 95% and above compaction. Proof rolling showed a pretty good compaction at least 98% or more. Three lots were backfilled to subgrade as shown in the below pictures.
Upload Images
Image
Description
1
Picture of Lots 99-102 viewed towards west
2
Picture showing a South ward view of lot# 99, at subgrade
3
A southward view of lot# 100 backfilled to subgrade
4
Picture portraying southward view of lot# 101
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel