Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
Today backfill of building pads as well as green area was aggressively done. The green area between building pads (see the attachment) was filled for more than three feet. Building pads 99-102 are also filled where lots 99 & 100 are almost to subgrade. And the road going almost E-W as shown in the picture below is to subgrade.
Upload Images
Image
Description
1
Picture showing the E-W road and bldg pads behind
2
Picture portraying the green area and bldg pads in a process of backfilling
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel