Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Observations/Finding
Summary
*
Sever filling activities were conducted throughout the day and density tests were done as usual. After several cut and fill, the road reached to a subgrade a as shown in the figure below. Density measures takes showed a compaction as high as 99%. More over, a temporary pond filled by water and surrounding which is a location for Lot#70 and a road was observed by me and Ram to check how the fill will have to be. During the inspection a 7.0 feet pit showed unwanted materials. The proof role conducted also showed a slightvmovement suggesting lose and wet material underneath. After several discussion with the Superintendent of the Grading Co. we reached a nosensus. Considering about 20+ feet fill, there is no risk for the building pad as well as for the road if we fill a proper and suitable material with reasonable moisture content compatible with the proctor. Therefore, the Grading Co Superintendent agreed to drain the water and fill the specified area. For more detail please see the attached pictures.
Upload Images
Image
Description
1
The road at sbgrade
2
The location after test pit investigation and proof role where backfill was suggested
3
The test pit where unwanted materials were observed
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel