Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
Extensive filling and packing activities were conducted to bring lots 70-77 and lots 99-101 to subgrade. As shown in the below figure, the fill is 8' and 4' to subgrade respectively. The moisture is good and the compaction also pretty good always greater than 95%. All tests confirm good compaction and very often proof rolling will be done in a situation where soil moisture is high and compaction is very marginal.
Upload Images
Image
Description
1
Picture depicting status of fill for building pads 70-72 and 77.
2
Building pads for lots 99-101 and internal road
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel