Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
Today, extensive filling activity followed by various tests at each lift was conducted. And the tests result shows 95% and above, but proof rolling indicates a pretty good compaction suggesting a minimum of 98%. Detail activities on the site are shown below.
Upload Images
Image
Description
1
Picture showing a general lots preparation
2
The western view showing bldg pad preparation for lots 99&100
3
Lots 99 and 100 as well as the access road to the other part of the site.
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel