Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C195(Ramp 21 Replacement)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
As requested, our AS Engineering & Consulting LLC representative was on site to observe concrete placement. The following were performed this day: 1) Air content tests, concrete temperature, slump and unit weight were taken for Truck #1 and Truck #3 sampled. 2) One set of seven (7) beams were cast. All concrete tests were found to be within job specifications.
Upload Images
Image
Description
1
One set of 7 beams
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel