Density test report
Date
*
Project Number
*
2021C002(Runway 9L End Around Taxiway)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Fawad Shagiwal (Fawad Shagiwal)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes and material submittals. The following observations were observed on the site this day. <ul> <li>Excavation of a trench for the installation and placement of a 46 foot long, 12-inch diameter water line for the fire hydrant was completed using CAT (315FL) equipment.</li> <li>The placement of No. 57 stone atop the water line for the fire hydrant was completed.</li> <li>One (1) foot lifts were placed and compacted for the trench using a trench packer (RTSC3).</li> <li>Density test results indicate that the compacted material met the project requirements of 95% the maximum dry density obtained by the (Standard Proctor ASTM 698).</li> </ul> <div class="thumb_view"> <div class="row"></div> </div>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel