Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C168(Reserve @ Gum Springs)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
As requested, our AS Engineering & Consulting LLC representative was on site to observe grading and backfilling operations for the above referenced project. The following were observed this day: The placement and compaction of backfill soils for the sewer trench between, F2 and F1 manholes and storm water trench, between A18 and SL1 and B13 and B13.1 and fill placement for several lots continued this day. At the time of arrival, our representative observed that work was in progress with1-foot lifts being placed and compacted using CP56B and trench compaction equipment. Compaction testing was performed using the Standard Test Method for Density of Soil in Place by Drive-Cylinder (ASTM D 2937), along with general probing using a 3/8″ diameter probe rod. Density test results indicate that most of the compacted materials met the project requirement of 95% of the maximum dry density obtained by a Standard Proctor ASTM 698. In addition, a potential groundwater issue (see attached photo for location) was fixed utilizing filter fabric and rock.
Upload Images
Image
Description
1
Location showing groundwater problem and fixed by fabric and rock
2
One of the bldg pad were drive cylinder test is taken
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel