Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C219(Bekaert Silo Concrete Testing - Rome)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day: <strong>Location:</strong> Footing within a building (Photos attached) <strong>Objective:</strong> A request was made to make cylinder samples for testing the concrete being placed into a footing inside the building. <hr /> <strong>Site Observations:</strong> <ul> <li>No footing bearing capacity inspections were requested or conducted during this operation.</li> <li>Concrete was mixed on-site by hand with an unmeasured amount of water, which may impact the consistency and performance of the mix.</li> <li>Approximately 40 bags of 5000 psi concrete were used in the footing pour.</li> </ul> <hr /> <strong>Concrete Testing:</strong> <ul> <li>The first slump test conducted on-site yielded a 4-inch slump.</li> <li>Seven cylinder samples were prepared on-site for compressive strength testing: <ul> <li><strong>2 cylinders</strong> for 3-day strength testing.</li> <li><strong>2 cylinders</strong> for 7-day strength testing.</li> <li><strong>2 cylinders</strong> for 28-day strength testing.</li> <li><strong>1 cylinder</strong> was designated as a "hold" sample.</li> </ul> </li> </ul> The cylinder samples were delivered (after 24 hours of curing) to the laboratory for testing. <hr /> <strong>Conclusion:</strong> No additional observations or issues were noted during or after the concrete placement. The test results from the laboratory will determine the adequacy of the concrete's compressive strength over the designated testing periods. <hr /> This report summarizes the collection of concrete cylinder samples for testing from a footing pour inside the building.
Upload Images
Image
Description
1
Mixing by hand
2
one location of footing
3
information provided
4
Concrete bags used
5
foundation work
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel