Daily Field Report
Density test report
Date
*
Project Number
*
2023C180(Lakeside Sub. - Lovers Lane, Calhoun)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
<ul> <li>The total area of down cut at lots 125-131 was 9105 sq.ft whereas the volume of soil down cut was 27315 cubic ft.</li> <li>Before starting backfill the cut area was proff rolled (see attachment) and bumping areas were identified and cut.</li> <li>The grading company was trying to do backfill using rocky dirt but I strongly advise not to do because it will not be compacted. The contractor is informed and accepted.</li> <li>Right now they are using wet dirt and I suggested to do one lift and plough it to get dry for tomorrow. And the contractor is doing that (see the attachment)</li> </ul>
Upload Images
Image
Description
1
Back filled and ploughed to get dry
2
Proff rolling before back fill
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel