Density test report
Date
*
Project Number
*
2023C180(Lakeside Sub. - Lovers Lane, Calhoun)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
The grading companies are working on sewer and storm line, though it is time taking. The sewer line 10.2-10.3 pipe line is done. They put proper gravel beneath before soil back fill (see the attachment). The storm line pipe burying is not also done yet, but they did backfill b/n BB8 & BB9 (see attachment) and compaction tests is done.
Upload Images
Image
Description
1
Sewer line 10.2-10.3
2
Storm line b/n BB8 and BB9
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel