Daily Field Report
Density test report
Date
*
Project Number
*
2023C180(Lakeside Sub. - Lovers Lane, Calhoun)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
During the day I was supervising the gav and soil backfill at the sewer site. In addition, I did nuclear tests and exercise at different locations and familiarize my self with the machine together with Russ.
Upload Images
Image
Description
1
The machine and the model doing soil.compaction
2
The nuclear gauge at various tests
3
Sewer line filled with gav (rock).
4
Addingbwater on gav before compaction
5
Sewer line backfilled with soil and cmpacted
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel