Daily Field Report
Density test report
Date
*
Project Number
*
2023C180(Lakeside Sub. - Lovers Lane, Calhoun)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
Upon arrival I communicate the Super of grading co. Then he infirmed me they are working storm and sewer lines. The sewer line is at 10.1-10.2and it is 160' long and 8' deep. They are backfilling with gav rock (see the attachment) from bottom to top. The back fill is done with 1' lift and compaction. The storm line is line 12 b/n Bb9 and BB10 manhole. It is 137' long & 5' deep (see the attachment). Back fill is 1' gav rock at the bottom and then dirt very 1 ' lift.
Upload Images
Image
Description
1
Storm line
2
Sewer line
3
Lake side project site
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel