Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2021C058(Parkside at Mason Mill)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe the contractor's work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made during our evaluation: This report provides an assessment of the footing excavations for Lots #161 thru 165, carried out on this specified site. The assessment includes excavation dimensions, depth, cleanliness, and the results of soil testing using a hand auger, Dynamic Cone Penetrometer (ASTM STP-399), and general probing tests. The reinforcing steel was checked for correct size, number of bars, location of bars, spacing, cleanliness, support against displacement, splicing, clearance and steel grade. Reinforcing steel appeared to meet job specifications for size, spacing and quantity. The footing excavations were noted to be in general accordance with the project drawings with respect to size and depth. Additionally, it was observed that the footing excavations were generally free of loose soil, debris, and water. Note: inspected 3 footings locations highlighted in red line in the attached photo. Dynamic Cone Penetrometer (ASTM STP-399) results at the test locations displayed soils capable of supporting a net allowable bearing pressure of 2000 psf. General probing using a 3/8" diameter probe rod found surficial soils in the base of the footing to be suitable for concrete placement. DCP1 DCP2 DCP3 <table style="height: 120px;width: 97.5358%" width="594"> <tbody> <tr style="height: 48px"> <td style="width: 6.3783%;text-align: center;height: 48px">Depth (Feet)</td> <td style="width: 7.32518%;text-align: center;height: 48px">Blows per 3/4" Increment</td> <td style="width: 7.29307%;text-align: center;height: 48px">Depth (Feet)</td> <td style="width: 7.4149%;text-align: center;height: 48px">Blows per 3/4" Increment</td> <td style="width: 6.95537%;text-align: center;height: 48px">Depth (Feet)</td> <td style="width: 9.19115%;height: 48px">Blows per 3/4" Increment</td> </tr> <tr style="height: 24px"> <td style="width: 6.3783%;text-align: center;height: 24px">1</td> <td style="width: 7.32518%;text-align: center;height: 24px">8</td> <td style="width: 7.29307%;text-align: center;height: 24px">1</td> <td style="width: 7.4149%;text-align: center;height: 24px">8</td> <td style="width: 6.95537%;text-align: center;height: 24px">1</td> <td style="width: 9.19115%;text-align: center;height: 24px">9</td> </tr> <tr style="height: 24px"> <td style="width: 6.3783%;text-align: center;height: 24px">2</td> <td style="width: 7.32518%;text-align: center;height: 24px">10</td> <td style="width: 7.29307%;text-align: center;height: 24px">2</td> <td style="width: 7.4149%;text-align: center;height: 24px">11</td> <td style="width: 6.95537%;text-align: center;height: 24px">2</td> <td style="width: 9.19115%;text-align: center;height: 24px">11</td> </tr> <tr style="height: 24px"> <td style="width: 6.3783%;text-align: center;height: 24px">3</td> <td style="width: 7.32518%;text-align: center;height: 24px">refused</td> <td style="width: 7.29307%;text-align: center;height: 24px">3</td> <td style="width: 7.4149%;text-align: center;height: 24px">refused</td> <td style="width: 6.95537%;text-align: center;height: 24px">3</td> <td style="width: 9.19115%;text-align: center;height: 24px">refused</td> </tr> </tbody> </table> <ul> <li>Footing subgrade conditions should remain dry and free of loose soils/debris prior to concrete placement. If exposed to inclement weather, the foundation subgrade should be re-observed by ASEC,</li> </ul>
Upload Images
Image
Description
1
2
3
4
5
6
7
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel