Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C195(Ramp 21 Replacement)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
As requested, our AS Engineering & Consulting LLC representative was on site to perform the following: 1) Moisture tests were performed on sand materials placed. 2) Slump tests and one set of 5 cylinders were cast. 3) Air, slump, temperature and unit weight tests for the 1st truck of the normal batch were performed. 4) The above tests and two sets of seven beams were cast from trucks #23 & #56. There was some delay in concrete placement throughout the pour due to equipment issues.
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel