Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C195(Ramp 21 Replacement)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
As requested, our AS Engineering & Consulting LLC representative was on site to observe the following: 1) Stripped seven beams cast yesterday and placed into curing. 2) Completed moisture tests for #67 & #4 sand materials. 3) Air content, concrete temperature, slump and unit weight tests were performed for the first truck placement. 4) Five air content tests were performed for concrete sampled throughout the pour. The first four tests indicated air contents higher than job specifications. 5) The casting of two sets of beams for 189 and 405 cubic yards placed.
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel