Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C116(Peeples Valley Rd, Overlook at Pettit)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Fawad Shagiwal (Fawad Shagiwal)
Observations/Finding
Summary
*
<p style="text-align: left">As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes and material submittals. The following observations were observed on the site this day:</p> <ul> <li style="text-align: left">The placement and compaction of backfill for the construction entrance was in progress using CP54B, RA30, D51PX and CAT330 equipment.</li> <li style="text-align: left">Construction of a 25 feet long segment of retaining wall section #D was in progress.</li> <li style="text-align: left">Construction of RCC recast box culverts at the outlet area of the detention pond was in progress.</li> <li>Construction of precast RCC wing walls at the four corners of the RCC precast box culverts was in progress.</li> <li style="text-align: left">Ten (10) inch lifts were placed and compacted for backfilling of a segment of retaining wall section #D using SD45B and trench packer BMP 8500 equipment.</li> <li style="text-align: left">At the time of arrival our representative observed that work was in progress for the construction entrance with 1-foot lifts being placed and compacted using CP54B and D51PX equipment.</li> <li style="text-align: left">Density test results indicate that placed and compacted materials met the project requirements of 95% the maximum dry density obtained by a Standard Proctor ASTM 698.</li> </ul>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel