Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C112(Sterlington)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made during our evaluation: <strong>Site Arrival and Initial Conditions:</strong> Upon arrival at the site, a rain delay was in effect for 2 hours. This delay affected the initial planned activities. <strong>Graded Aggregate Base (GAB) Placement:</strong> <ul> <li>The GAB was placed until completion, ending at the Cul-de-sac.</li> <li>The future roadway was compacted using a Hamm smooth drum roller HD14 to seal the surface.</li> <li>The GAB placed was not ready for testing at this time.</li> </ul> <strong>Future Activities and Equipment:</strong> <ul> <li>The paving company foreman stated that a large smooth drum roller would be delivered next week to provide compaction.</li> <li>Compaction testing will need to be completed once the large smooth drum roller is available.</li> </ul> <strong>Observations:</strong> <ul> <li>The delay due to rain was managed effectively.</li> <li>The compaction process with the HD14 roller was observed, but further compaction and testing are pending.</li> <li>Coordination with the paving company is ongoing to ensure timely delivery of necessary equipment.</li> </ul> <strong>Recommendations:</strong> <ul> <li>Monitor the delivery and usage of the large smooth drum roller.</li> <li>Schedule and conduct compaction testing as soon as the GAB is ready to ensure compliance with project specifications</li> </ul>
Upload Images
Image
Description
1
Cul-de-sac at end of main road
2
Starting of GAB placement 7/17
3
Approximately 6 inches or more of GAB depth.
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel