Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C180(Lakeside Sub. - Lovers Lane, Calhoun)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Marteze Jeter (Marteze Jeter)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made: Our representative observed the contractor place backfill using a CAT 336 excavator and Cat 315F excavator to place sewer main from MH 6.3 - 7.0. After the placement of PVC pipe the contractor then added No. 57 stone to 6 inches above pipe. Contractor also started to excavate MH 4.6 - 5.0 using a Komatsu excavator pc490 LC. Contractor then placed storm drain and backfilled with walk-behind roller. <strong>Observations:</strong> <ol> <li><strong>Backfilling Activities:</strong> <ul> <li>Backfilling was in progress for the sanitation sewer, and storm drain</li> <li></li> </ul> </li> <li><strong>Sewer Installation:</strong> <ul> <li>Sewer main was placed between MH 6.3-7.0</li> <li>storm drain was placed between MH 4.6-5.0</li> </ul> </li> <li><strong>Compaction Status:</strong> <ul> <li>Compaction was performed using a walk behind roller</li> </ul> </li> </ol> <strong>Conclusion:</strong> The ongoing backfilling and storm drainpipe installation activities are progressing as planned, with considerations for lift sizes and temporary measures discussed with the foreman.
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel