Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C116(Peeples Valley Rd, Overlook at Pettit)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Fawad Shagiwal (Fawad Shagiwal)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. The following observations were observed on the site this day: <ul> <li>The placement and compaction of backfill for Lots #66 to 73 and #80 to 88 progressed using CP54B, RA30, D51PX and CAT330 compaction equipment.</li> <li>The new trench was dig, excavated and built at the inlet area of the existing detention pond for the installation and placement of storm water manholes and sewer line.</li> <li>Installation and placement of ST M-2 4’0/5 and ST N-2 4’0/5 storm water manholes and storm lines were in progress.</li> <li>At the time of arrival our representative observed that work was in progress for Lots #66-73 and #80-88 with 2-foot lifts being placed and compacted using CP54B and D51PX equipment.</li> </ul>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
11
12
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel