Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C180(Lakeside Sub. - Lovers Lane, Calhoun)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Marteze Jeter (Marteze Jeter)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: The ASEC Engineering representative arrived on site and was informed that the contractors canceled work due to the onset of rain. Our ASEC representative will be notified once these soils are scarified and aerated. <strong>Observations:</strong> <ol> <li><strong>Backfilling Activities:</strong> Rain Event</li> <li><strong>Storm Drainpipe Installation: </strong>Rain Event</li> <li><strong>Compaction Status: </strong>Rain Event</li> </ol> <strong>Conclusion:</strong> The ongoing backfilling and storm drainpipe installation activities will progress as planned once the site dries out.
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel