Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C112(Sterlington)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to visually observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: <h3>Incident Summary</h3> A request was made to perform a proof-roll at 9:00 AM on the future deceleration lane. Upon arrival, it was observed that the future deceleration lane subgrade was not ready for proof-rolling, leading to the postponement of the scheduled activity. The foreman on-site decided to delay the proof-roll to the next day. <h3>Sequence of Events</h3> <ol> <li><strong>Proof Roll Request</strong> <ul> <li><strong>Requested Time:</strong> 9:00 AM</li> </ul> </li> <li><strong>Arrival at Site</strong> <ul> <li><strong>Time of Arrival:</strong> 9:00 AM</li> <li>Upon arrival, it was observed that the deceleration lane was not in a condition to perform the proof roll. Necessary preparations and compactions were incomplete.</li> </ul> </li> <li><strong>Assessment of Deceleration Lane Condition</strong> <ul> <li><strong>Observed Condition:</strong> <ul> <li>The surface was not adequately prepared.</li> <li>Required compaction levels were not achieved.</li> <li>Presence of loose material and unfinished grading.</li> </ul> </li> </ul> </li> <li><strong>Decision to Delay</strong> <ul> <li><strong>Decision By:</strong> On-Site Foreman</li> <li>The foreman decided to delay the proof-roll to allow for the completion of required preparations.</li> </ul> </li> </ol> <h3>Analysis</h3> <ol> <li><strong>Preparation Issues</strong> <ul> <li>Incomplete preparation of the deceleration lane hindered the scheduled proof-roll. This includes inadequate grading, compaction, and removal of loose materials.</li> </ul> </li> </ol> <h3>Immediate Actions Taken</h3> <ol> <li><strong>Communication</strong> <ul> <li>Confirmed the new scheduled time for the proof-roll.</li> </ul> </li> <li><strong>Preparation Plan</strong> <ul> <li>Coordinated with the foreman to ensure all necessary preparations for the deceleration lane are completed before the rescheduled proof-roll.</li> </ul> </li> </ol> <ol> <li style="list-style-type: none"></li> </ol> <h3>Conclusion</h3> The inability to perform the proof-roll as scheduled was due to the unprepared condition of the deceleration lane subgrade. Immediate actions have been taken to address the issue, and a new proof-roll has been scheduled for the next day.
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel