Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C111(DOA Fiber Infrastructure Improvements )
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Observations/Finding
Summary
*
As requested, our AS Engineering & Consulting representative was on site to observe daily activities. Today, the following was observed: <ul style="list-style-type: disc"> <li><span style="font-size: 12pt;font-family: arial, helvetica, sans-serif">The placement of backfill for the DOA Fiber infrastructure from 35 feet west of the east end, T/W SG runway 28-10 continued on this day.</span></li> <li><span style="font-size: 12pt;font-family: arial, helvetica, sans-serif">At the time of our arrival our representative observed that work was in progress with duct bank backfill being placed and compacted using trench compactor equipment. Density testing was performed using a nuclear density gauge.</span></li> <li><span style="font-size: 12pt;font-family: arial, helvetica, sans-serif">Density test results indicate that the compacted materials met the requirement of 90% of a standard proctor (ASTM 689). </span></li> </ul>
Upload Images
Image
Description
1
2
3
4
5
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel