Daily Field Report
Density test report
Date
*
Project Number
*
2023C180(Lakeside Sub. - Lovers Lane, Calhoun)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Marteze Jeter (Marteze Jeter)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: Our representative observed the contractor use a CAT 336 and SANY SY365LC equipment to excavate a trench from MH 6.9 - 6.11 (205.3 + 34.7+ 32 + 153.2). PVC sanitary sewer laterals were then placed. A CAT 938K was used to transport No. 57 stone and GAB. No. 57 stone was added to 6 inches above the sanitary sewer lateral. GAB and backfill was added from MH 6.9 - 6.11 and compacted with a walk behind roller. Our representative observed a CAT 3314 excavator place laterals between MH 1.5 - 1.6 and place sewer laterals. A CAT 938K loader was used to transport No. 57 stone and GAB. No. 57 stone was added to 6 inches above the sanitary sewer lateral. GAB and backfill was added from MH 1.5 - 1.6 and compacted with a walk behind roller. A CAT 3151 placed water line between Lots #86 alongside the roadway. Contractors also performed demolition, removed sewer pipes between Lots #45 - 46. <strong>Observations:</strong> <ol> <li><strong>Backfilling Activities:</strong> Contractors placed backfill for sewer laterals. Also added 6 inches of No. 57 stone then GAB.</li> <li><strong>Storm Drainpipe Installation: </strong>Contractors inserted sewer laterals.</li> </ol> <strong>Conclusion:</strong> The ongoing backfilling and storm drainpipe installation activities are progressing as planned.
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel