Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C180(Lakeside Sub. - Lovers Lane, Calhoun)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Marteze Jeter (Marteze Jeter)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: Our representative observed the contractor use a CAT 336 Excavator and CAT 3364 to excavate an 8-inch sanitary sewer trench from MH 9.0-10.0. After sanitary sewer trench was dug the contractor placed sanitary sewer laterals. A CAT 938K loader to transport No. 57 stone and GAB. No. 57 stone was added to 6 inches above the sanitary sewer lateral. GAB plus backfill was added from MH 9.0-10.0 and compacted with a 54-inch drum roller and walk behind roller. A Sany 3651 excavator was used to excavate a sewer trench from MH AH13-AH14. After sewer trench was excavated a Sany 3651 excavator was used to place 24 feet of 18-inch RCP storm drain. A CAT 938K loader was used to transport No. 57 stone and GAB. No. 57 stone was added to 6 inches above the storm drain. GAB and backfill was added from MH 6.8-6.9 and compacted with walk behind roller. <strong>Observations:</strong> <ol> <li><strong>Backfilling Activities:</strong> Contractors placed backfill in sewer laterals and storm trenches. Also added 6 inches of No. 57 stone then GAB.</li> <li><strong>Storm Drainpipe Installation: </strong>Contractors inserted sewer laterals, and storm drains.</li> </ol> <strong>Conclusion:</strong> The ongoing backfilling and storm drainpipe installation activities are progressing as planned.
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel