Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C116(Peeples Valley Rd, Overlook at Pettit)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Fawad Shagiwal (Fawad Shagiwal)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. The following observations were observed this day: <ul> <li>The placement and compaction of backfill for Section 1 was completed using CP54B compaction equipment. This area was proof-rolled with no severe pumping and/or rutting observed.</li> <li>The placement and compaction of backfill for Section 3 was in progress using CP54B, RA30, D51PX and CAT330 compaction equipment.</li> <li>Work was also in progress at Section 3 with 1-foot lifts being placed and compacted using CP54B and D51PX equipment.</li> </ul>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel