Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C180(Lakeside Sub. - Lovers Lane, Calhoun)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Marteze Jeter (Marteze Jeter)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: Our ASEC representative observed the contractors place backfill. Contractors used an excavator to place soil via heavy-duty dump trucks transported to the entrance way. Contractors then placed and compacted fill in 6-inch lifts. The lifts were probed using a 3/8" diameter probe rod. Our representative also observed the contractor place 2 feet of #57 stone in a 12-foot storm trench. Dynamic cone penetration tests were performed on Lots #34 & 33. See separate report from this date. Our ASEC representative also checked compaction on the roadway in front of Lots #36 through 33. <strong>Observations:</strong> <ol> <li><strong>Backfilling Activities:</strong> <ul> <li>Backfilling was in progress for the storm trench, utilizing 2-feet of #57 stone</li> <li>Discussions were conducted with the foreman regarding the placement of backfill over #57 stone. Contractors chose another day in the future to do so.</li> </ul> </li> <li><strong>Compaction Status:</strong> <ul> <li>Compaction in the entranceway and roadway in front of Lots #36 through 33 was found satisfactory.</li> </ul> </li> </ol> <strong>Conclusion:</strong> The ongoing backfilling and storm drainpipe installation activities are progressing as planned, with considerations for lift sizes and temporary measures discussed with the foreman.
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel