Daily Field Report
Density test report
Date
*
Project Number
*
2024C112(Sterlington)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
<span style="font-family: arial, helvetica, sans-serif">As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, </span><span style="font-family: arial, helvetica, sans-serif">applicable codes, and materials submittals. The following observations were observed on site this day.</span> Our ASEC representative arrived onsite to observe CMU block placement for retaining wall #1. Every 3rd course of block "Geo-Grid" was placed. No. 57 stone was utilized 1 foot behind the block and within the cells. No backfill was placed on this day due to the fill material being high in moisture content. In case of any questions or concerns with regards to our observations or recommendations stated in this report we will be more than glad to discuss them with you.
Upload Images
Image
Description
1
2
3
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel