Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C112(Sterlington)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. <strong>Overview:</strong> The following report document the procedures and outcomes of the A7 to A6 lifts conducted after the placement of 24-inch reinforced concrete pipe (RCP), B2 to B3 RCP placement and fill placement for future Lots #9, 10 and 11. Soil compaction was performed using various methods, including hand-held vibratory tamp, trench packer, and ride-on vibratory sheeps-foot. <strong>Procedure:</strong> <ol> <li>Soils were placed in 6-12 inch lifts.</li> <li>Compaction was initially executed using a hand-held vibratory tamp (Wacker Packer) for A7 to A6.</li> <li>The first three lifts on the sides of the pipe were tested with a 3/8 probe rod, probing approximately 1 to 2 inches.</li> <li>Once lifts were over the pipe, a trench packer was utilized.</li> <li>At a depth of -1 foot from the surface, compaction testing was conducted using a Troxler 3430 (see test report results separately).</li> <li>RCP was placed between B2 and B3 without stone bedding. This section was not ready for testing.</li> <li>Soil was placed at the future Lots #9, 10 and 11 at a depth of -3 feet from finished and compacted with a ride-on vibratory sheeps-foot (see test result report).</li> </ol> <strong>Test Results:</strong> <ol> <li>The compaction test conducted at a depth of -1 foot from the surface using a Troxler 3430 indicated insufficient compaction. Retesting at this location was not ready.</li> <li>The first test conducted at future Lots #9, 10 and 11 using a ride-on vibratory sheeps-foot resulted in failure. Additional compaction was requested and completed, and the retest yielded acceptable results.</li> </ol> <strong>Conclusion:</strong> The compaction testing revealed issues with insufficient compaction at certain depths and locations. Retesting and additional compaction efforts were required to meet the desired compaction standards.
Upload Images
Image
Description
1
A7 to A6
2
testing A6
3
Testing
4
A7
5
V2 to B3
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel