Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C116(Peeples Valley Rd, Overlook at Pettit)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: <strong>Summary:</strong> An initial site visit was conducted to gather a laboratory sample aimed at determining the optimum density-moisture relationship (proctor) for a soil type present on-site. The collected sample was subsequently taken to the laboratory for analysis. Additionally, a meeting was held with Dalton, the on-site foreman, to discuss soil lift sizes and related recommendations for efficient compaction practices. <strong>Meeting Highlights:</strong> During the meeting with Dalton, the following points were discussed: <ol> <li><strong>Soil Lift Sizes Recommendation:</strong> <ul> <li>A recommendation was made to limit soil lifts to a maximum of 6 inches for trench packer compaction.</li> <li>For more extensive compaction efforts using a ride-on vibratory sheep's foot compactor, a maximum soil lift size of 12 inches was advised.</li> </ul> </li> </ol> <strong>Observations:</strong> <ul> <li>Topsoil removal was observed during the site visit.</li> <li>No other significant observations were made during this visit.</li> </ul> <strong>Conclusion:</strong> The initial site visit and subsequent meeting was discussed establishing lift size considerations.
Upload Images
Image
Description
1
excavating for proctor
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel