Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Fawad Shagiwal (Fawad Shagiwal)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. The following observations were observed on the site this day. <ul> <li>Two layers of 20,096 cubic feet of rock was placed and compacted in temporary pond between Lots #19 and 20 using Excavator (PC390LC) equipment.</li> <li>One layer of 10,000 cubic feet of soil and/or rock was placed and compacted at the top of each layer of rock in temporary pond between Lots #19 and 20.</li> </ul>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel