Daily Field Report
Density test report
Date
*
Project Number
*
2022C106(Taxiway 2022 Pavement Replacement )
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor's work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: <ul> <li>A proof-roll observation was performed in the Taxiway replacement 22, phase 1B, eastern asphalt shoulder between approximate, coordinates N: 9225.29 E: 14037.31 to coordinates, N: 9305.26 E: 14017.70.</li> <li>A fully loaded water truck was used to proof-roll the above-mentioned subgrade with multiple passes across the area.</li> </ul> No severe yielding and/or deflection was observed during the proof-roll at all areas mentioned above. One exception was a small area, approximately 35' x 26' from the edge of phase 7A to 26 feet north of phase 7A. Recommended to undercut 6 inches from the area and replace with GAB. <ul> <li>Our representative along with Deion of ATLQA and the ATLNext representative Barry Miller observed the proof-roll.</li> <li>Kelly placing GAB on the east shoulder of the Taxiway for preparation of asphalt placement</li> <li>Performed density testing on GAB.</li> <li>BBH was preparing lights on the west face of the Taxiway prior to concrete placement.</li> <li>C&G preparing for concrete and placing rebar for inlet 1-4.</li> <li>Observed the placement and testing of concrete for west curb.</li> <li>Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time</li> <li>In case of any questions or concerns with regards to our observations or recommendations stated in this report we will be more than glad to discuss them with you.</li> </ul>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel