Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C106(Taxiway 2022 Pavement Replacement )
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor's work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: <ul> <li>A pre-pour observation was performed for Taxiway 2022 replacement in lane 4, hand pour, panel 1 from the west end, portions of the project on this day. Contractor completed rebar and dowel basket placement for these lanes.</li> <li>The writer visually inspected the installation and setup of these lanes and advised the contractor representatives of any minor corrections that were needed.</li> <li>The contractor cleaned loose rock and debris and standing water from the base.</li> <li>Baskets were found to be level, straight and secured.</li> <li>Dowel bars were found to have epoxy. Embedment length was found to be 15 inches into concrete.</li> <li>The writer along with Thomas of ATLQA and ATLNext representative Braylyn signed the pre-pour card.</li> <li>Performed a proof-roll for shoulder located in the east side of phase 7A. Subgrade soils appeared to be at finished grade elevation based on the information provided. A fully loaded water truck was used to proof-roll the above-mentioned subgrade with multiple passes across the area.</li> </ul> No severe yielding and/or deflection was observed during the proof-roll at all areas mentioned above. <ul> <li>Observed the placement and testing of concrete for west curb at east roadway from STA 108+75 to 110+25 and Middle roadway from STA 204+75 to STA 206+00.</li> <li>Observed and performed testing of concrete for Taxiway lane 4, hand pour, panel 1, from west end.</li> <li>Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time.</li> <li>Kelly was working under drains from the edge of purposed Taxiway lane 3 phase 7 towards manhole A-1.</li> </ul> In case of any questions or concerns with regards to our observations or recommendations stated in this report we will be more than glad to discuss them with you.
Upload Images
Image
Description
1
2
3
4
5
6
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel