Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C106(Taxiway 2022 Pavement Replacement )
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
At the request of the client’s representative, AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe the contractor's work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: <ul> <li>A proof-roll observation was performed on the taxiway 2022 phase B.</li> <li>A fully loaded tandem-axle dump truck was used to proof-roll the above-mentioned subgrade with multiple passes across the area.</li> <li>No severe yielding and/or deflection was observed during the proof-roll at all areas mentioned above.</li> <li>Our representative along with Thomas of ATLQA and the ATLNext representative Braylyn observed the proof-roll.</li> </ul> <ul> <li>Work was being performed in the Lanes 1 and 3 portion of the project on this day. Contractor completed rebar and dowel baskets for these lanes.</li> <li>The writer verified proper installation and setup of this lanes 1 and 3, advised the contractor representatives of any minor corrections that may be needed.</li> <li>BBH installed and poured concrete for duct bank between MH A-1 and MH A-2.</li> <li>CWM was pouring flow fill for the existing manhole.</li> <li>ATL Paving was placing GAB for CTB use.</li> <li>In addition to this, the writer assisted and observed straight edge testing of phase A on CT.</li> </ul> In case of any questions or concerns with regards to our observations or recommendations stated in this report we will be more than glad to discuss them with you.
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel