Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Fawad Shagiwal (Fawad Shagiwal)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. The following observations were observed on the site this day. <ul style="list-style-type: disc"> <li>Placement and compaction of backfill soils for the sewer pipe trench between MH A7 to MH A8 was in progress.</li> <li>Construction of a Mechanically Stabilized Earth (MSE) retaining wall was in progress.</li> <li>Placement, backfilling and compaction of soils at the vicinity of Lots #43 through #49 was in progress using a sheeps-foot (CP56B), (D6K2) and (QT-4) compactors.</li> <li>Splitting and breaking of rock at the vicinity of Lots #60 and #61 was in progress using (300G) equipment.</li> </ul>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel