Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Fawad Shagiwal (Fawad Shagiwal)
Observations/Finding
Summary
*
<ul> <li>As requested, the site was visited by our AS Engineering and Consulting (ASEC)representative for the purpose of providing quality control inspection and testing services. The following observations were observed on the site this day.</li> <li><strong>Placement, backfilling and compaction at the vicinity of Lots #30 to 37 and Lots #48 to 51 were in progressed using (D8T), (QT-4) and (CP56B) compaction equipment.</strong></li> <li><strong>Soil placement continued for the lots that were in progress.</strong></li> <li><span style="font-family: arial, helvetica, sans-serif"><strong>Placement and compaction of backfill soils for sewer pipe trench between MH A5 to MH A6 continued.</strong></span></li> <li><span style="font-family: arial, helvetica, sans-serif"><strong>One (1) foot lifts were being placed and compacted on trench to MH A6 and compacted using a sheeps-foot (CP44B) and (R-13) compactor.</strong></span></li> </ul>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel