Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C165(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Fawad Shagiwal (Fawad Shagiwal)
Observations/Finding
Summary
*
<span style="font-family: arial, helvetica, sans-serif">As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications applicable codes and materials submittals. The following</span> <span style="font-family: arial, helvetica, sans-serif">observations were observed in the site today</span>. <ul style="list-style-type: square"> <li><span style="font-family: arial, helvetica, sans-serif">Placement of fill soils and compaction of Lots #31 to #37, #41 to #45 and #49 to #53 were in-progress using (D8T), (Q-4) and (CP56B) compaction equipment.</span></li> <li><span style="font-family: arial, helvetica, sans-serif">At the time of arrival our representative observed that the work was in progress on sewer pipe trench placement between MH A5 to MH A6 with 1 foot lifts being placed and compacted using a sheep-foot (CP44B) compactor.</span></li> </ul> <!--more-->
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel