Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C112(Sterlington)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. <strong>Date of Visit:</strong> March 12, 2024 <strong>Purpose:</strong> The purpose of the visit was to conduct compaction testing at the site. A request by on site manager was made the previous day. <strong>Observations:</strong> Upon arrival at the site on March 12, 2024, it was observed that no work was being conducted except for the hauling off of mulch. The following key observations were made: <ol> <li><strong>Absence of Work Activity:</strong> <ul> <li>No construction or site work was in progress during the visit.</li> <li>The only observable activity was the removal of mulch from the site.</li> </ul> </li> <li><strong>Communication with Site Superintendent:</strong> <ul> <li>A call was made to the site superintendent to inquire about the absence of work.</li> <li>It was communicated that the crew assigned to the project was deployed to another site for the day, resulting in the lack of activity at the current site.</li> </ul> </li> </ol> <strong>Actions Taken:</strong> Given the absence of work activity and the crew's deployment to another project, the following actions were taken: <ol> <li><strong>Rescheduling of Compaction Testing:</strong> <ul> <li>Compaction testing scheduled for the day was not feasible due to the absence of construction activity.</li> <li>Efforts will be made to reschedule the compaction testing for a later date when work activity resumes at the site.</li> </ul> </li> </ol> <strong>Conclusion:</strong> The site visit on March 12, 2024, revealed a lack of construction activity at the site, with the crew being deployed to another project for the day. As a result, compaction testing could not be conducted as scheduled. Rescheduling of testing will be necessary once work activity resumes at the site.
Upload Images
Image
Description
1
Empty site
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel