Density test report
Date
*
Project Number
*
2023C195 (draft)(Kimbal Bridge Tract)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
As requested, a representative from AS Engineering and Consulting (ASEC) visited the site to provide quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes, and material submittals. The following observations were made on-site today: <ol> <li>Contractor Sunbelt Asphalt installed a cement-treated base (soil cement) base course approximately 6 inches deep from STA 11+00 to STA 15+00.</li> <li>Density tests were performed on the top of the outlet of pond #1 and the roadway between Lots #9 and #28, Lots #10 and #29, and Lots #11 and #30.</li> <li>A sample of the soil cement was taken to our laboratory for further testing.</li> <li>A six-inch undercut was performed in areas identified as failing in the acceleration and deceleration lanes. Approximately 18 inches of graded aggregate base (GAB) was installed in the undercut areas to bring the elevation to the proposed bottom of the asphalt. The remainder of these lanes received approximately 12 inches of GAB. Compaction efforts were monitored, and a proof roll will be performed before the asphalt is placed.</li> </ol> We appreciate the opportunity to be of service on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
11
12
GAB Installation in Acceleration and Deceleration lane
13
GAB Installation in Acceleration and Deceleration lane
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel