Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C180(Lakeside Sub. - Lovers Lane, Calhoun)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to observe compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. <ol> <li><strong>Equipment in Operation:</strong> <ul> <li>2 excavators</li> <li>Water truck</li> <li>Trench packer</li> <li>Caterpillar vibratory sheeps-foot compactor (CP44)</li> </ul> </li> <li><strong>Sanitation Mainline Pipe:</strong> <ul> <li>Located between 4.0 and 4.1</li> <li>Backfilling and compacting in progress</li> <li>Lifts consist of a mix of soil and fragmented rock, ranging from approximately 1-2 feet in depth</li> <li>Small areas compacted with a trench-packer</li> <li>Main area compacted with CP44 with vibration turned on</li> </ul> </li> <li><strong>Depth of Soil Placed:</strong> <ul> <li>Soil placed around 4.1 was approximately 2-3 feet in depth for the first lift. Lift thicknesses should be approximately 6 inches per lift</li> </ul> </li> <li><strong>Backfilling Details:</strong> <ul> <li>Laterals opposite the future asphalt road backfilled with soil, approximately 1-2 feet in depth per lift (034-02)</li> <li>Laterals under the future asphalt road backfilled with Graded Aggregate Base (GAB) for all lifts, ranging from 1-2 feet in depth (081-02, 082-02)</li> <li>Water applied before compaction</li> </ul> </li> <li><strong>Excavation:</strong> <ul> <li>Excavation began on the mainline between 4.1 and 4.2</li> </ul> </li> <li><strong>Note:</strong> <ul> <li>Pipe and bedding installation had been previously completed and were not observed during this activity.</li> </ul> </li> </ol> This update provides a comprehensive overview of the ongoing construction activities, including excavation work on the mainline between 4.1 and 4.2. <div class="w-full text-token-text-primary" data-testid="conversation-turn-3"> <div class="px-4 py-2 justify-center text-base md:gap-6 m-auto"> <div class="flex flex-1 text-base mx-auto gap-3 md:px-5 lg:px-1 xl:px-5 md:max-w-3xl lg:max-w-[40rem] xl:max-w-[48rem] group final-completion"> <div class="relative flex w-full flex-col agent-turn"> <div class="flex-col gap-1 md:gap-3"> <div class="mt-1 flex justify-start gap-3 empty:hidden"> <div class="text-gray-400 flex self-end lg:self-center justify-center lg:justify-start mt-0 -ml-1 h-7 visible"></div> </div> </div> </div> </div> </div> </div> <div class="mx-auto"> <div> <div class="mx-auto mt-2 inline-flex rounded-xl border border-gray-100 dark:border-gray-700"></div> </div> </div>
Upload Images
Image
Description
1
2
3
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel