Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C112(Sterlington)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
<ol> <li>Introduction: a site visit was conducted by a representative from AS Engineering and Consulting (ASEC) to provide quality control inspection and testing services. The purpose of the visit was to verify compliance with project drawings/specifications, applicable codes, and materials submittals. Visual observation techniques were employed during the visit.</li> <li>Site Visit Details: <ul> <li>Date: 2/19/2024</li> <li>Attendees: ASEC Representative, Project Superintendent</li> </ul> </li> <li>Observations: During the site visit, the following observations were made: a. Initial Site Visit and Meeting: An initial meeting was held with the Fritz representative and project superintendent to discuss project progress and ongoing activities. b. Silt Fence Installation: It was observed that silt fence installation was in progress. The silt fence serves as an erosion control measure to prevent sediment runoff during construction activities. c. No Testing Completed: No testing activities were completed during the site visit as no backfilling operations were being performed at the time.</li> <li>Discussion: a. Progress Review: The meeting with the project superintendent provided insights into the progress of the project. b. Testing Plan: The absence of backfilling operations prevented the completion of testing during the visit. It was agreed to schedule testing activities at a later stage of the project when backfilling commences.</li> <li>Recommendations: Based on the observations and discussions, the following recommendations are made: a. Schedule Testing: Coordinate with the project team to schedule testing activities at an appropriate stage of the project, such as when backfilling operations are initiated. b. Monitor Compliance: Ensure ongoing compliance with project specifications, applicable codes, and materials submittals throughout the project duration.</li> <li>Conclusion: The site visit provided valuable insights into the progress of the project, including the installation of the silt fence. Testing activities were not completed during the visit due to the absence of backfilling operations.</li> </ol> This report summarizes the observations made during the site visit and highlights the importance of adherence to project specifications and testing plans for quality control and compliance assurance.
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel