Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C195 (draft)(Kimbal Bridge Tract)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
<span style="font-family: arial, helvetica, sans-serif">As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, </span><span style="font-family: arial, helvetica, sans-serif">applicable codes, and materials submittals. The following observations were observed on site this day.</span> <ul> <li><span style="font-family: arial, helvetica, sans-serif">Evaluate soil bearing/stability at the bottom of the excavated footings for retaining wall 7.</span></li> <li><span style="font-family: arial, helvetica, sans-serif">The foundation excavations were observed to be excavated to the specified size and appeared to be at the proper depth based on the contractor's layout. The foundation excavation was observed to be clear of loose soil, debris, and water.</span></li> <li><span style="font-family: arial, helvetica, sans-serif">NOTE: The depth of the pier should reach the footing of retaining wall 6, but they did not drill it to that point. Some piers were harder to drill so they only managed to drill 2 to 3 feet. It was recommended to drill the piers that weren't drilled to the footing to retaining wall 6. For the piers that weren't able to be drilled to the proper depth, an RFI from engineer is required.</span></li> </ul> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
2
3
4
5
6
7
8
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel